Skip to main content

Projects Executed

Pipelines Jobs Executed

S / N
Description
Company
Year
1
Sectional Replacement Of 28”Forcados Trunk Line
SPDC
2012
2
Fabrication And Installation Of PIG Launcher / Receiver & Slot Sweeping, Flushing And Leak Testing Of 16” X 2.5 Km Excravos River Crossing
SPDC
2012
3
Sectional Replacement Of 8” Batan Delivery Line
NPDC
2013
4
Sectional Replacements Of 8"Afremo Line To Escravos Manifold
NPDC
2013
5
Sectional Replacement Of 24" X 4 Km Gbokodo - Ologbo Pipeline
SEPLAT
2014
6
Sectional Replacements Of 28" Rapele Manifold Line To Forcados River Manifold
SPDC
2015
7
In - Service Welding At Tunu 20" Line To Brass Creek Manifold
SPDC
2015
8
Construction Of 16" X 37 Km Trunk line From Otumara To Opuama
NPDC
2016
9
Construction Of 16" X 18 Km Gasline From Tunu To Bilabiri Manifold
SPDC
2017

Flowline & Facility Jobs Executed

S / N
Description
Company
Year
1
Replacement of 6.21Km vandalized 6’’ Sch. 40 flow line with 6” Sch. 80 to Kanbo 4L
SPDC
2009 - 2010
2
Replacement of 8.30Km vandalized 6’’ Sch. 40 flow line with 6” Sch. 80 to Kanbo 6T
SPDC
2009 - 2010
3
Replacement of 1.6Km Stolen 4’’ Sch. 40 flow line to Batan 6S
SPDC
2010
4
Replacement of 2.3Km stolen 4” Sch. 40 flow line to Ajuju 6T
SPDC
2010
5
Replacement of 1.6Km stolen 4” Sch. 40 flow line to Ajuju 1 LReplacement of 1.6Km stolen 4” Sch. 40 flow line to Ajuju 1 L
SPDC
2010
6
Replacement of 1.6Km stolen 4” Sch. 40 flow line to Ajuju 1 S
SPDC
2010
7
Replacement of 1.0Km stolen 4’’ Sch. 40 flow line to Batan 2S
SPDC
2010
8
Replacement of 1.6Km stolen 6’’ Sch. 40 flow line to Batan 4T
SPDC
2010
9
Replacement of 1.9Km stolen 4’’ Sch. 40 flow line to Batan 5T
SPDC
2010
10
Replacement of 1.4Km stolen 4’’ Sch. 40 flow line to Batan 9T
SPDC
2010
11
Replacement of 2.0 Km stolen 4’’ Sch. 40 flow line to Batan 8L
SPDC
2010
12
Replacement of 7 Swamp Wellhead Platforms to Ajuju Wells 6 & 1 and Batan Wells 2, 5, 4, 6 & 9
SPDC
2010
13
Fabrication of five swamp wellhead platforms
SPDC
2010
14
Replacement of 3.0Km, 4” Sch 40 flow line to Tunu Well 1S
SPDC
2010
20
Salvaging of 3.0Km 4” Sch 40 flow line to Tunu Well 1S
SPDC
2010
15
Replacement of 7.5Km, 6” Sch 80 flow line to Kanbo Well 5L
SPDC
2010
16
Replacement of 4.5Km, 4” Sch 40 flow line to Tunu Well 4L
SPDC
2010
17
Replacement of 4.5 Km, 4” Sch 40 flow line to Tunu Well 4S
SPDC
2010
18
Replacement of 7.5Km, 6” Sch 80 flow line to Kanbo Well 5S
SPDC
2010
19
Salvaging of 3.0Km 4” Sch 40 flow line to Tunu Well 1L
SPDC
2010
20
Salvaging of 3.0Km 4” Sch 40 flow line to Tunu Well 1S
SPDC
2010
21
Salvaging of 4.5Km 4” Sch 40 flow line to Tunu Well 4L
SPDC
2010
22
Salvaging of 4.5Km 4” Sch 40 flow line to Tunu Well 4S
SPDC
2010
23
Salvaging of 7.5Km 6” Sch 40 flow line to Kanbo Well 5L
SPDC
2010
24
Salvaging of 7.5Km 6”Sch 40 flow line to Kanbo Well 5S
SPDC
2010
25
Refurbishment of a burnt two deck swamp oil wellhead platform
SPDC
2010
26
JIV / Sectional Replacement of 6” Sch 80 Kanbo 5L
SPDC
2011
27
Removal of one unit of existing 20” Flare stack and Install one unit of 20” x 24 Smokeless Flare Stack in Bank 1
SPDC
2011
28
Installation of one unit of old 20” Flare (removed from Bank 1) in Bank 3
SPDC
2011
29
Open the Free Liquid Knock Out (FLKO) vessels 1 and 2 for Inspection
SPDC
2011
30
Sectional Replacement Of 6’’ Sch 80 Tunu 6T Wellhead Riser And Approach
SPDC
2011
31
Repair Of Damaged Walkway And Hand Rails
SPDC
2011
32
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 13T (Pipe Dia. 6”)
SPDC
2011
33
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 11T (Pipe Dia. 6”)
SPDC
2011
34
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 10T (Pipe Dia. 8”)
SPDC
2011
35
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 10T (Pipe Dia. 8”)
SPDC
2011
36
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 8T (Pipe Dia. 6”)
SPDC
2011
37
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 7T (Pipe Dia. 6”)
SPDC
2011
38
Wrapped seven flow line goose necks with 3” polykene wrapper Tunu Well 6T (Pipe Dia. 6”)
SPDC
2011
39
Replacement of 6” Sch 40 x 1.20Km flow line to Seibou Well 1T
SPDC
2011
40
Replacement of 6” Sch 40 x 1.20Km flow line to Seibou Well 2L
SPDC
2011
41
Replacement of 6” Sch 40 x 1.20Km flow line to Seibou Well 2S
SPDC
2011
42
Flooding, Pigging, Hydrotesting, Dewatering and Venting of 3 x 21Km x 6” Sch 40 Seibou bulklines
SPDC
2012 - 2013
43
Replacement of 4” Sch 40 x 4.00Km flow line to Opukushi Well 24T
SPDC
2012 - 2013
44
Replacement of 4” Sch 40 x 5.56 Km flow line to Opukushi Well 30S
SPDC
2012 - 2013
45
Replacement of 4” Sch 40 x 1.50 Km flow line to Opukushi Well 32S
SPDC
2012 - 2013
46
Replacement of 4” Sch 40 x 3.00Km flow line to Opukushi Well 33L
SPDC
2012 - 2013
47
Replacement of 4” Sch 40 x 3.24Km flow line to Opukushi Well 34T
SPDC
2012 - 2013
48
Replacement of 4”Sch 40 x 1.50Km flow line to Opukushi Well 38T
SPDC
2012 - 2013
49
Replacement of 6” Sch 40 x 8.00Km flow line to Seibou Well 1T
SPDC
2012 - 2013
50
Replacement of 6” Sch 40 x 8.00Km flow line to Seibou Well 2L
SPDC
2012 - 2013
51
Replacement of 6” Sch 40 x 8.00Km flow line to Seibou Well 2S
SPDC
2012 - 2013
52
Salvaging of 4” Sch 40 x 4.00Km flow line to Opukushi Well 24T
SPDC
2012 - 2013
53
Re-design and Fabrication of the 2” Sch 160, 3” Sch 160 and 6” Sch 80 flow path of Opukushi Well 38T
SPDC
2013
54
Re-routing of 2Km x 6” Sch 40 flowline to Tunu well 6T
SPDC
2013
55
Re-routing of 2Km x 6” Sch 40 flowline to Tunu well 7T
SPDC
2013
56
JIV / Sectional Replacement of 6” Sch 80 of Kanbo Well 7L Flowline
SPDC
2013
57
Fabrication and Installation of Beniseide Well 17S Hook Up Arm
SPDC
2013
58
Fabrication and Installation of Batan Well 12T Hook Up Arm
NPDC
2014
59
Sectional Replacement of 4” Sch 40 x 2.2Km flowline to Ajuju Well 6T, Batan flowstation
NPDC
2014
60
Sectional Replacement of 6”Sch 80 x 500.0m Flowline to Kanbo Well 5S
SPDC
2014
61
Replacement of 4”Sch 80 x 4.80Km Flowline to Odidi Well 32T
NPDC
2014
62
Sectional replacement of 6”Sch 80 x 100m Flowline to Seibou Well 2S
SPDC
2015
63
Replacement of 2 x 4” Sch 40 x 4 Km flow line to Escravos Well 15L/S
SPDC
2015
64
Replacement of 2 x 4” Sch 40 x 0.75Km flow line to Escravos Well 1L/S
SPDC
2015
65
Replacement of 2 x 4” Sch 40 x 0.75Km flow line to Escravos Well 2L/S
SPDC
2015
66
Replacement of 6” Sch 80 x 0.75Km flow line to Escravos Well 6L
SPDC
2015
67
Estuary Cluster v Corrosion Work
SPDC
2016
68
Replacement of 2 x 4” Sch 40 x 1 Km flow line to Escravos Well 11L/S
SPDC
2016
69
Replacement of 6” Sch 80 x 12Km PE Coated flow line to Ajatiton W1L
SPDC
2017
70
Soku Produced Water Handling Optimization Project (Mechanical)
SPDC
2018
71
Sectional Replacement of Seibou Bulklines (Bulklines 2, 3 & 4)
SPDC
2017, 2018
72
EA 36 Spool Repair
SPDC
2019
73
Replacement of 4”Sch 80 x 1Km Flowline to Otumara Well 41L
SPDC
2019
74
Sectional Replacement Of Kanbo Well 7L/S
SPDC
2019
75
Seibou W1 & W3 Wellhead Platform Rehabilitation
SPDC
2019
76
Sectional Replacement of Seibou Bulklines (Bulklines 3 & 4)
SPDC
2019
77
FYIP 5 OilWells Completion Remaining Works
SPDC
Ongoing

Capital Dredging

S / N
Description
Company
Year
1
Dredging of 90,000 cu.m of Shaghara Wells 3 & 5 Slots
SPDC
2014
2
Kokodiagbene Land Reclamation of 600,000 cu.m
NDDC
2015

Interested In Our Services?

Feel Free To Contact Us